FORMWORK TIE ROD SYSTEM STEEL TIE ROD D15/17MM 75MM 100MM STEEL CONE for CONCRETE CONSTRUCTION

Formwork & Scaffolding Accessories Manufacturer

Scaffolding & Formwork Solutions-Formwork & Scaffolding Accessories Manufacturer

Langheng-Leading Manufacturers, Exporters and Wholesaler of Tie Rod, Wing Nut, Anchor Nuts, Shuttering Clamp, Water Stopper Nut, Adjustable Prop, Base Jack, Cup Lock Scaffolding, Hex Nuts ( Tie Rod Connector ), Jack Nuts, Prop Sleeve with Nut, Rapid Clamps, Universal Jack, Waller Plate and Scaffolding Couplers from Langheng.

We are engaged in production of scaffolding and formwork accessories to the construction industry. Formwork is the term given to either temporary or permanent molds into which concrete or similar materials are poured. In the context of concrete construction, the falsework supports the shuttering moulds. Our innovative scaffolding & formwork carries slab have lightness, the modularity and best quality finishes which is applied for building support.

 

Category Product Name Material Specification Application
Aluminum Formwork Accessories Super Plate Casted Nut Cast Iron M12–M16 / Custom Fixing aluminum formwork tie rods
Aluminum Formwork Accessories Set Steel / Casted / Plastic Pins, wedges, washers Aluminum formwork connection and locking
Concrete Formwork Accessories Steel Tie Rod Q235 / Q345 Steel 15/17mm, 20/22mm Connect and fasten formwork panels
Casting Water Stopper Cast Iron / Spheroidal Graphite 15/17mm Prevent water leakage at joints
Tie Rod Nut Casted Iron 15/17mm, Wing & Anchor types Tighten tie rods securely
Formwork Prop System Adjustable Steel Prop Q235B / Q345B Steel φ48/56/60mm / 1.5–4.5m height Vertical support in concrete formwork
Fork Head Jack Base Steel Fork Head Width 80–120mm Support H20 or steel beams
Prop Sleeve & Nut Cast Iron / Steel Inner/Outer Sleeve & Nut Set Height adjustment for steel props
Cup Nut Cast Iron M12–M22 Locking system for props or tie rods
Formwork Clamps BFD Clamp Steel 150/200mm Fixes formwork panels and beams
Casted Wedge Clamp Casted Steel With wedge lock Locks formwork at joint position
Spring Clamp Spring Steel 60–100mm jaw Quick tightening for panel edges
Cuplock Scaffolding Accessories Blade Forged Steel 48.3mm OD Inserted into top cup for ledger locking
Bottom Cup Cast Steel 48.3mm OD Fixed onto vertical standard
Top Cup Cast Iron / Ductile Iron 48.3mm OD Secures horizontal tubes
Ringlock Scaffolding Accessories Ledger End / Brace End Forged Steel OD 48.3mm End connectors for ledgers and braces
Rosette & Pin Cast Steel / Forged Steel 122mm / 133mm Node point on vertical standard
Scaffolding Clamps (British/German Standard) Half Coupler Drop Forged Steel 48.3mm Fix scaffolding tubes to walls
Girder Coupler Drop Forged Steel 48.3mm x I-beam Fix tube to steel beam flanges
Sleeve Coupler Drop Forged Steel 48.3mm End-to-end tube connection
Beam Coupler Drop Forged Steel 48.3mm x I-beam Connect tubes to large steel beams
Swivel Coupler Drop Forged Steel 48.3mm Connect tubes at any angle
Double Fixed Coupler Drop Forged Steel 48.3mm Connect tubes at 90 degrees
Putlog Coupler Drop Forged Steel 48.3mm Connect putlog to transom tube

 

All support systems have to be height adjustable to allow the formwork slab to be placed at the correct height and to be removed after the concrete is cured.

Spectacular accidents have occurred when the forms were wither removed too soon or had been under-designed to carry the load imposed by the weight of the uncured concrete. Less critical and much more common (though no less embarrassing and often costly) are those cases in which under-designed formwork bends or breaks during the filling process (especially if filled with a high-pressure concrete pump). This then results in fresh concrete escaping out of the scaffolding and formwork in a form blowout, often in large quantities.

Show More